Assistant Polish Suite
Daily Assistant Console
A build-run assistant pane with truthful state, model switching, blocker handling, and matching docs.
4 milestones 17 tasks 40 agents
9 plan 19 execute 25 review 1 fix
202k peak context
151k median execute
4h 40m total 12m 33s per task
9m 39s plan 2h 14m execute 1h 29m review
218 edits 1.4k commands
codex harness
This run turned the Gantry Assistant from a live but awkward pane into a daily build-run console. It separated startup truth from runless fixtures, gave the pane real sizing and composer behavior, moved assistant controls onto the divider, added next-turn model selection, routed halted-run blockers into the transcript, and then reconciled the MCP and documentation surface with what actually shipped.
The cut was not a simple straight line. Menu inventory and assistant-log truth came back in later milestone notes, and the blocker milestone's first corrective sprint had to be retried and replanned before the rest of the blocker flow could stand on it. The current tree shows the durable result as TUI state and rendering code, assistant turn identity and transcript plumbing, run-scoped MCP contracts, surface inventory documents, public docs, and generated menu-tour assets.
How this walkthrough is structured
Feature
What did the run build and ship?
The tree now presents the assistant as a build-run console with truthful availability, resizable transcript UI, next-turn model choice, inline blocker handling, and audited MCP documentation.
Build
How did Gantry structure the work?
The run split assistant polish into pane foundations, control selection, blocker routing, and truth documentation, with the only major recovery concentrated where stale menu assumptions blocked later work.
Milestone 1
Pane Layout Foundations
4 tasks 11 agents 1h 1m wall time 202k peak context
The surviving TUI code still has distinct assistant console status, a measured composer, and a state-backed chat pane geometry model. Rendering now derives the transcript, composer, divider row, and explicit hit regions from that model. The pane can be minimized, restored, maximized, and resized without treating the old fixed assistant strip as the source of truth.
This milestone carried the physical and state foundation for the assistant pane before any new controls depended on it. Its briefs separated startup truth, composer measurement, pane geometry, and input wiring, which let each worker consume a named contract from the previous row. The only recorded red point in the milestone was the startup-state sprint, and the repair happened at that first boundary before layout work built on it.
Startup Reality Check
3 agents 17m 22s wall time 153k peak context 1 fix
The domain and TUI state still distinguish assistant startup, active console state, skipped state, and runless presentation. Build runs can report a live assistant without inheriting the runless fixture's reduced story. Disabled assistant affordances can now explain startup or skip reasons instead of claiming that a normal build has no assistant.
This sprint was asked to stop using one chat availability flag as a proxy for whether a real assistant console existed. That was the right first cut because every later disabled row, menu action, and typed message needed an honest startup state to read. The gate caught trouble here and a repair ran before review, so the run placed the difficulty at the state contract rather than after UI controls had already consumed it.
Expanding Composer
2 agents 8m 56s wall time 129k peak context
The render layer still computes a composer layout from the draft and the available pane size. Long input wraps inside the assistant pane, grows until its cap, and then scrolls internally while preserving cursor visibility. The mouse hit range comes from the same layout, so focus behavior follows the rows the user can actually type into.
This sprint narrowed the problem to the composer as a measured input component. It consumed startup truth but did not try to change pane sizing or menus, so the worker could focus on wrapping, internal scrolling, cursor placement, and mouse focus. The recorded boundary stayed green, which fit a contract that later geometry could call without reopening text input behavior.
Chat Pane Layout
1 agents 11m 29s wall time 110k peak context
The current renderer still computes chat pane geometry from the body, chat state, and composer input. It returns the upper area, assistant bounds, transcript and composer rectangles, restore target, presentation state, and divider regions in one place. That keeps collapsed, restored, and maximized drawing on the same model rather than scattered height decisions.
This sprint replaced the fixed assistant pane with a geometry contract while leaving dragging for the next worker. The brief was intentionally about rectangles, remembered size, temporary excursions, and reserved divider regions, which made the result testable without having to finish every interaction at once. It passed cleanly, so the later divider work inherited a stable layout model.
Resizable Divider Control
2 agents 16m 48s wall time 202k peak context
The TUI still has divider regions for menu title space, resize controls, drag area, and status text. The pane remembers a user's restored size and treats minimize or maximize as temporary presentations rather than destructive changes. The menu-tour script and rendering code still reflect the pane controls that this sprint introduced, although later documentation reframed the assistant surface around the divider menu.
This sprint wired the geometry into user interaction. Its scope was the real control surface: dragging, minimize, maximize, restore, keyboard actions, and preservation of explicit divider regions for future menus. The run facts show a clean implementation with an extra green gate pass, so the input handoff did not need a replan before the menu milestone started.
Milestone 2
Assistant Menu Models
4 tasks 10 agents 1h 2m wall time 178k peak context
The assistant divider and model-selection machinery are still present in the TUI and assistant turn code. Assistant identity now travels through domain events, transcript entries, and rendered conversation state, while harness resolution follows the build harness unless a dedicated assistant choice overrides it. Some menu-tour wording was later rewritten, so this milestone's exact inventory claim is now represented through the later surface contract rather than preserved as originally planned.
This milestone moved from pane mechanics to assistant choice. The split first established a divider menu surface, then resolved the default assistant identity, then made selection safe across turns, and finally exposed the Model menu. The top-level ledger records a later scope note: the milestone finished green, but live menu-tour coverage and the assistant-log target were still not fully aligned with the brief.
Assistant Divider Menu
2 agents 14m 53s wall time 168k peak context
The TUI still renders a separate assistant menu system on the pane divider when that surface is present. Assistant actions dispatch through the shared action path instead of private row handling, and the normal build menu no longer needs a stale Chat title to expose pane controls. The live tree's surface inventory now documents the assistant divider separately from the main menu tour.
This sprint was asked to separate assistant controls from the normal run menu bar. It consumed the startup and divider-region contracts from the pane milestone, which kept the worker focused on ownership, dispatch, disabled states, and the surviving runless fixture path. The sprint itself stayed green, but the milestone note later shows that tour coverage and log targeting still needed follow-up.
Default Assistant Identity
2 agents 11m 3s wall time 178k peak context
The assistant harness resolution still lives beside the broader harness configuration and reports its selected identity to the console. Explicit assistant choices and model pins keep precedence, while the default can follow the resolved build harness. The docs still describe that distinction and note that a failed assistant startup does not stop the deterministic build.
This sprint fixed the selection source before exposing live switching. The brief gave the worker a precedence ladder and a failure contract, so it could change harness resolution without touching the menu picker itself. It passed with no recovery, making the next sprint's turn-selection work depend on a named resolved identity rather than a hidden default.
Next Turn Selection
1 agents 22m wall time 118k peak context
Assistant turns still emit identity events before reply events, and completed turns persist the assistant identity in the transcript. Pending and activated selection events remain part of the domain surface. That means a model change is visible as a next-turn state change rather than an ambiguous rewrite of the response already running.
This sprint made model changes a conversation contract before the UI made them easy to click. Its job was to capture the assistant identity at turn start, keep pending selections separate, and make transcript evidence survive later readers. It stayed green, so the Model menu could be a front end over a real turn boundary instead of mutating an in-flight reply.
Model Menu
2 agents 5m 47s wall time 164k peak context
The assistant documentation and TUI state still describe a Model menu that lists local harness choices and shows current, pending, and failed selection states. The menu queues a selection request rather than retargeting the running turn. The docs also preserve the caveat that file-based MCP config delivery can overwrite temporary harness config during an assistant turn.
This sprint connected the previous contracts to the user-facing divider menu. Its brief avoided provider catalog discovery and kept the scope to local harness choices, current and pending markings, and next-turn dispatch. The recorded sprint stayed green, but later review still found surrounding inventory and log truth incomplete at the milestone boundary.
Milestone 3
Assistant Blocker Handling
5 tasks 23 agents 1h 51m wall time 186k peak context
The current domain and TUI still model blocker investigation as a pending prompt rendered in the assistant transcript. Inline controls and status affordances let the user answer or stop from the pane, while the assistant can answer the same live prompt through the MCP path after investigation. Runtime and how-it-works documentation now describe blocker routing as the shipped path, with ordinary prompts still using modals.
This milestone had to repair truth debt before it could reroute blockers. Its first sprint was retried and replanned several times, then the later blocker-routing, inline-action, resolution, and documentation sprints ran cleanly. The top-level note says one menu-tour requirement was withdrawn rather than completed here, which pushed final inventory reconciliation into the last milestone.
Assistant Menu Truth
12 agents 57m 55s wall time 148k peak context 2 replans
The surviving TUI code still targets assistant logs from the active run instead of the runless diagnostic directory. Assistant menu actions remain tied to shared dispatch ids, and stale unavailable-chat behavior is no longer treated as the normal build-run truth. The narrated inventory gap did not fully settle here; the later surface inventory contract is the durable statement of that boundary.
This sprint was the stress point of the whole run. It was asked to clean stale menu rows and make Show assistant log target the active build run before blocker controls were layered on top. Review found the first attempts incomplete, the unit was retried and replanned, and the eventual pass narrowed the proof to dispatch parity and log targeting while explicitly leaving narrated tour coverage out.
Route Blockers To Assistant
2 agents 13m 50s wall time 151k peak context
Blocker investigation prompts still enter the assistant transcript rather than the ordinary modal path. The state keeps the prompt pending while showing failure context in the pane, and routing alone does not submit an assistant message. Non-blocker prompt kinds continue to use modal UI, preserving the direct operator-question path.
This sprint changed the first visible moment of a halted-run blocker after menu truth had a workable base. The brief isolated routing: no ordinary modal, no automatic assistant turn, focus moves to the pane, and the original prompt stays pending. It passed cleanly, so the following sprint could add actions to preserved blocker state instead of reconstructing it.
Inline Blocker Actions
2 agents 14m 49s wall time 186k peak context
The renderer still draws blocked-run transcript entries with inline action buttons and a visible blocked state outside the scroll position. Those actions target the original prompt identity and stop being live once the prompt resolves. The quick stop path remains discoverable without turning blocker choices into persistent assistant menu rows.
This sprint restored the controls that the modal used to provide, but in the transcript where the blocker is read. It consumed the routed-blocker contract and kept ephemeral choices attached to the pending prompt rather than putting them into the permanent assistant menu. The clean gate showed the new action home could be verified without changing prompt semantics.
Assistant Blocker Resolution
2 agents 10m 3s wall time 122k peak context
Assistant turn failures still become transcript events instead of disappearing from the pane. The live MCP host can carry answer_prompt to the attached engine, and successful answers resolve the same pending prompt that inline choices use. Failed attempts remain visible and do not falsely clear the blocked state.
This sprint completed the assistant side of the loop after manual inline actions existed. Its boundary was deliberately about failure visibility and live prompt resolution, not about rerouting the blocker again. The sprint needed no recorded recovery, so the MCP answer path fit the blocker state introduced by the prior rows.
Blocker Docs
2 agents 7m 59s wall time 100k peak context
Runtime and architecture docs still say halted-run blockers are handed to the assistant pane, remain pending, and can be answered or stopped through the original prompt path. They also state that merely staging the blocker does not spend assistant tokens. Menu and screencast handover documents were later folded or superseded by the final surface inventory work, so this sprint's docs survive partly as current prose and partly as inputs to that later contract.
This was the narrow documentation pass for the blocker milestone. The brief constrained it to runtime and inventory references affected by the new blocker path, leaving the broader assistant and MCP rewrite for the final milestone. It passed with an extra green gate, but the milestone note still recorded that the menu-tour contract itself needed later settlement.
Milestone 4
MCP Truth Docs
4 tasks 11 agents 54m 25s wall time 186k peak context
The current tree carries an assistant surface inventory contract, an MCP truth contract, a rewritten assistant and MCP reference, README coverage, runtime documentation, and generated menu-tour assets. The docs now distinguish build-run assistant behavior, diagnostic assistant use, runless bare invocation, and manual external MCP attachment. The MCP server code still exposes explicit list_runs scope behavior while keeping legacy aliases and run_bash compatibility.
This milestone closed the run by converting disputed assistant behavior into contracts and documentation. It first settled the surface inventory, then repaired MCP truth claims, then rewrote the reference docs, and finally aligned public and screencast-facing copy. The milestone stayed green, but its top-level note records that bare runless assistant wording remained a truth problem at that moment; the current tree has since documented that surface as a diagnostic and planning mode rather than the build-run front door.
Assistant Surface Map
2 agents 17m 22s wall time 173k peak context
The handover contract still describes the normal build-run bar, the assistant divider bar, the chat-only surface, blocker affordances, and excluded stale rows. It explicitly treats the assistant divider as a separate tested surface rather than folding it into the normal menu tour. The generated menu-tour assets remain in the tree, while the contract explains how to read their scope.
This sprint reopened the inventory question before public docs could rest on it. Its brief required a written and tested contract for which menus and tours are live, which runless remnants are diagnostic or fixture surfaces, and where blocker affordances belong. It passed cleanly and gave the remaining documentation sprints a named source of truth.
MCP Truth Contract
2 agents 10m 40s wall time 122k peak context
The MCP tool registry still documents list_runs as full by default with an explicit active scope for non-finished runs. The server accepts the scope argument, rejects invalid values, preserves legacy wire aliases, and keeps run_bash in the advertised action surface. The handover contract records which old mirror claims were corrected and where regression coverage lives.
This sprint isolated protocol truth from assistant prose. The worker could audit list_runs, scoped status, task listing, report reading, and run_bash without also rewriting every public page. It passed with an extra gate, leaving the next sprint a tested MCP contract rather than a set of assumptions.
Assistant Reference Docs
2 agents 12m 33s wall time 186k peak context
The assistant and MCP reference now reads as a current guide to the build-run assistant. It documents divider controls, Model selection, blocker handling, logs, transcripts, harness precedence, diagnostic assistant runs, runless bare invocation, external MCP attachment, and harness-aware MCP delivery. Adjacent CLI, config, harness, runtime, and architecture docs were adjusted to point at that same behavior.
This sprint consumed the surface and MCP contracts and rewrote the durable operator reference. Its scope was broad documentation, but the inputs were already settled: build-run assistant shape, diagnostic command, manual MCP attachment, logs, harness selection, and file-based config caveats. It passed with another green gate, so the final public sweep could stay brief.
Public Docs Coherence
2 agents 7m 3s wall time 133k peak context
The README now presents the assistant as available inside interactive build runs, with keyboard focus, divider resizing, Model selection, and blocker handoff. The web and project docs point readers to the assistant and MCP reference rather than repeating stale messages-bar phrasing. The menu-tour script and generated artifacts still exist, but current documentation frames them through the final surface contract.
This sprint was the closing copy pass after the reference docs were in place. It was asked to align README, web docs, subsystem indexes, handover notes, and screencast narrative with the contracts already established. The recorded run stayed green, so the final worker did not have to change MCP manifest order or delete chat coverage to make the story coherent.